Jobs Reference

Item Client's Name Description Commencement Date Completion Date
1 CARRIER SINGAPORE (PTE) LIMITED FAR EAST SHOPPING CENTRE
MECHANICAL & ELECTRICAL WORK
MAR'2017 COMPLETED - DEC'2017
2 DAI-DAN CO., LTD DCS OUTDOOR COOLING
TO SUPPLY & INSTALL CHILLED WATER PIP WORKS
APR'2017 COMPLETED - DEC'2017
3 PRO-MATRIX PTE LTD KINGSLANDS PHASE 4A
TO SUPPLY LABOUR AND TOOLS TO INSTALL AIRCONDITIONING SYSTEMS FOR CHILLED, CONDENSER, CONDENSATE PIPEWORK SYSTEM AND LOOSE SITE, FOAMING INSUATION FOR CHILLED WATER PIPEWORK, FITTIG ACCESSORIES AND VALVE ACCESSORIES.
APR'2017 COMPLETED - FEB'2018
4 TRANE DISTRIBUTION PTE LTD WOODLANDS ICA
MECHANICAL WORKS
APR'2017 COMPLETED - FEB'2018
5 TRANE DISTRIBUTION PTE LTD TUAS CHECKPOINT
MECHANICAL WORKS
APR'2017 COMPLETED - FEB'2018
6 PRO-MATRIX PTE LTD KINGSLANDS PHASE 4A
PROPOSED A&A WORKS TO 5TH STOREY AND 4TH STOREY OF EXISTING 5-STOREY SINGLE USER DATA CENTRE AT 13 SUNVIEW WAY, SINGAPORE 627541
SUPPLY CHILLED, CONDENSER AND CONDENSATE PIPEWORK, PIPEWORK FITTING, FITTING ACCESSORIES AND VALVE ACCESSORIES.
APR'2017 COMPLETED - FEB'2018
7 DAI-DAN CO., LTD DCS RAFFLES MRT
TO SUPPLY & INSTALL 1 LOT OF ELECTRICAL AND CONTROL WORKS.
MAY'2017 COMPLETED - FEB'2018
8 SNK (ASIA PACIFIC) PTE LTD SINGTEL DATA CENTRE WEST
AIR COOLED CHILLER SYSTEM FOR BACKUP, INSTALLATION OF NEW CHILLED WATER PIPING, SUPPLY & INSTALL SITE FOAMING INSULATION FOR CHILLED WATER PIPE.
MAY'2017 COMPLETED - FEB'2018
9 TRANE DISTRIBUTION PTE LTD NUS EA
TO SUPPLY AND INSTALLATION OF ROOF COOLING TOWER BALANCE WORKS & L1 CHILLER PLANTROOM BALANCE WORKS AT EA ENGINEERING BUILDING WORKS AT EA ENINEERING BUILDING OF NUS.
MAY'2017 COMPLETED - JAN'2018
10 GENNAL INDUSTRIES PTE LTD SINGPORE EXPO
PROPOSED ADDITIONS & ALTERATIONS WORKS TO SINGAPORE EXPO EXHIBITION HALL 1 TO HALL 6 ON LOT 09355P & 09356T MK27; EXHIBITION HALL 7 TO HALL 10 ON LOT 10851V PT, 98328L, 07361C, 10187K PT, 07360L PT MK27 AT EXPO DRIVE / UPPER CHANGI ROAD EAST / CHANGI SOUTH AVENUE 1, SINGAPORE
AUG'2017 COMPLETED - MAR'2018
11 KAER PTE LTD PLOT B1, PLOT B2 & PLOT D AT PAYA LEBAR
FOR THE SUPPLY (OF SOME EQUIPMENT), INSTALLATION, COMMISSIONING AND MAINTENANCE OF CHILLER PLANT SYSTEM (CPS) FOR PAYA LEBAR QUARTER PLOT B1, B2 & D (OFFICE BLOCKS) PROJECT AT PAYA LEBAR ROAD
AUG'2017 COMPLETED - SEP'2018
12 PRO-MATRIX PTE LTD M7
PROPOSED RETRO-FITTING OF EXISTING 4-STOREY SINGLE-USER WAREHOUSE INTO DATA CENTRE AND ANCILLARY FACILITIES AT 71 TAGORE LANE SUPPLY LABOUR AND TOOLS TO INSTALL AIRCONDITIONING SYSTEM FOR CHILLED, CONDENSER SYSTEM AND LOOSE JOINT SITE FOAMING INSULATION FOR CHILLED WATER PIPEWORK.
SEP'2017 COMPLETED - MAR'2018
13 VOLEX ENGINEERING PTE LTD NUS UCC
PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING UNIVERISTY CULTURAL CENTRE WITHININ NATIONAL UNIVERISTY OF SIGAPORE ON LOT 1703 & 2888 PT MK03, 10 KENT RIDGE CRESCENT.
SEP'2017 COMPLETED - JAN'2018
14 PAN PACIFIC SINGAPORE PAN PACIFIC SINGAPORE
REPLACEMENT OF KITCHEN VENTILATION & EXHAUST FANS
NOV'2017 COMPLETED - 2018
15 TRANE DISTRIBUTION PTE LTD MECHANICAL WORK @ MAXWELL HOUSE DEC'2017 COMPLETED - JUL'2018
16 KURIHARA KOGYO CO., LTD APCS FACTORY - M&E
TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER AND CONDENSATE WATER PIPEWORK FOR 1ST, 2ND AND 3RD STOREY.
JAN'2018 COMPLETED - AUG'2018
17 TRANE DISTRIBUTION PTE LTD NUS MD 3
CHILLED, CONDENSER AND CONDENSATE PIPEWORK SYSTEM
FEB'2018 COMPLETED - OCT'2018
18 KURIHARA KOGYO CO., LTD ACMV WORK AT CARGO AGENT BUILDING E.
TO SUPPLY LABOUR, TOOLS AND MATERIALS FOR HOT TAPPING WORKS, CEILING WORKS, AIRCON DUCTWORKS, CHILLED WATER PIPEWORKS.
FEB'2018 COMPLETED - SEP'2018
19 WAH LOON ENGINEERING PTE LTD M&E INSTALLATIONS TO EQUINIX SG3 PHASE 3 AT NO.26A AYER RAJAH CRESCENT TO SUPPLY NECESSARY LABOUR, TOOLS & MATERIALS TO PERFORM 1-LOT OF 'ACMV INSTALLATION WORKS' AT L2 & ROOF. MAR'2018 COMPLETED - OCT'2018
20 TAKENAKA CORPORATION TANAKA ELECTRONICS SINGAPORE PTE LTD - COOLING TOWER MAR'2018 COMPLETED - SEP'2018
21 SNK (ASIA PACIFIC) PTE LTD HI-TECH -WEN 2 - TOWER 2 CORE & SHELL + ZONE 6 + ZONE 7
INSTALLATION OF PIPING WORK FOR TOWER 2 CORE & SHELL + ZONE 6 SUPPLY & INSTALL INSULATION WORK FOR TOWER 2 CORE & SHELL + ZONE 6
APR'2018 COMPLETED - APR'2019
22 DAI DAN CO., LTD T3 NEW CHILLER PLANT
SUPPLY LABOUR TO INSTALL CHILLED WATER PIPE, CONDENSER WATER PIPE AND CONDENSATE DRAIN PIPE
MAY'2018 COMPLETED - AUG'2019
23 HOTEL MARINA CITY PTE LTD / (THE PAN PACIFIC HOTEL SINGAPORE) REPLACEMENT AHU AND FCU AT PAN PACIFIC BOULEVARD JULY'2018 COMPLETED - OCT'2018
24 DAI-DAN CO., LTD SDC MOD DCP 1
TO CARRY OUT ALTERNATION AND ADDITIONAL BY PASS ON CHILLED WATER HEADER INCLUDE RELOCATION OF FCU AT DCP 1
JULY'2018 COMPLETED - OCT'2018
25 WAH LOON PLANT & INSTRUMENTATION PTE LTD REPLACEMENT OF CHILLER PLANT 2 TO SG 1 AT NO.20 AYER RAJAH CRESCENT AUG'2018 COMPLETED - DEC'2018
26 KURIHARA KOGYO CO., LTD NTU
CHILLER PLANT UPGRADING
SEP'2018 COMPLETED - DEC'2018
27 ALMAX CONCEPTS PTE LTD OFFICE TOWER TOILET REFURBISHMENT AT LEVEL 6 TO LEVEL 22 AT PARKWAY PARADE OCT'2018 COMPLETED - SEP'2019
28 TRANE DISTRIBUTION PTE LTD MICRON BENDEMEER
CHILLER INSTALLATION WORK
OCT'2018 COMPLETED - JAN'2019
29 DAI-DAN CO., LTD SDC MBS 2018 - BAYFRONT EVENT SPACE (BES)
TO SUPPLY, INSTALLATION AND COMMISSIONING OF SERVICE CONNECTION FACILITIES TO DEVELOPMENT AT MARINA BAY 2018
OCT'2018 COMPLETED - DEC'2018
30 TRANE DISTRIBUTION PTE LTD MOUNT ELIZABETH HOSPITAL
PROPOSED REPLACEMENT OF WATER COOLED CHILLER SYSTEM
NOV'2018 COMPLETED - MAY'2019
31 DAI-DAN CO., LTD MSD GLYCOL
TO SUPPLY & INSTALLATION OF MECHANICAL PACKAGE INSULATION WORKS (OLD LOOP & OLD LOOP EQUIPMENT)
DEC'2018 COMPLETED - SEP'2021
32 KAER PTE LTD GREAT EASTERN CENTRE
RETROFITTING WORKS & PERF GUARANTEE CHILLER PLANT
DEC'2018 COMPLETED - JULY'2019
33 BRITISH AND MALAYAN ALEXANDRA TECHNOPARK B COOLING TOWER
REPLACEMENT WORK
JAN'2019 COMPLETED - JUN'2019
34 DAI-DAN CO., LTD SDC MBS 2018
TO SUPPLY, INSTALLATION & COMMISSIONING OF SERVICE CONNECTION FACILITIES TO DEVELOPMENT AT MARINA BAY 2018 AS FOLLOWS:
JAN'2019 COMPLETED - OCT'2020
35 SIEMENS PTE LTD SIEMEN CENTER EPC
MEP & STRUCTURAL WORKS FOR INSTALLATION, TESTING AND COMMISSIONING OF A NEW WATER-COOLED CHILLER SYSTEM
FEB'2019 COMPLETED - AUG'2019
36 WAH LOON ENGINEERING PTE LTD CHINA MOBILE INTERNATIONAL
SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 1 LOT OF AIR-CONDITIONING & MECHANICAL VENTILATION (ACMV) SYSTEM FOR LEVEL 3, 4, 6 & ROOF & SUPPLY, DELIVERY, INSTALLATION OF QUICK RELEASE FIRE DAMPERS AND DUCTS FOR CRAH UNITS, LEVEL 3, 4 & 6.
FEB'2019 COMPLETED - JULY'2019
37 PRO-MATRIX PTE LTD PROPOSED ADDITIONS AND ALTERATIONS OF AN EXSITING 6-STOREY INDUSTRIAL BUILDING WITH BASEMENT AT 9 TAI SENG DRIVE SINGAPORE 535227 FEB'2019 COMPLETED - NOV'2019
38 SHINING DEVELOPMENT PTE LTD PROPOSED ADDITIONAL & ALTERATION TO 1ST AND 2ND STOREY (PODIUM) OF EXISTING NOVENA SQUARE BUILDING ON LOT 00812A TS29 AT 238 THOMSON MAY'2019 COMPLETED - APR'2020
39 SNK (ASIA PACIFIC) PTE LTD GOOGLE - WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 & PHASE 1 ZONE 2 INSTALLATION OF PIPING WORK, PIPE INSULATION WORK FOR ZONE 0+1 MAY'2019 COMPLETED - MAY'2021
40 CBRE PTE LTD RAFFLES HOTEL
FOR THE SUPPLY, FABRICATION, DELIVERY, INSTALLATION AND MAINTENANCE OF KITCHEN UPGRADING AND ASSOCIATED WORK FOR THE PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING THREE STOREY RAFFLES AND SHOPPING ARCADE WITH BASEMENT WITH A BASEMENT CARPARK AT BEACH ROAD, 328 NORTH BRIDGE ROAD
AUG'2019 COMPLETED - MAR'2020
41 KURIHARA KOGYO CO., LTD ICH
SUPPLY AND INSTALL CHILLED WATER, CONDENSER AND CONDENSATE AND CONDENSATE PIPEWORKS FOR RIGHT WING AT INTEGRATED CARE HUB PROJECT
SEP'2019 SEP'2022
42 TRANE DISTRIBUTION PTE LTD PARAGON
MECHANICAL WORKS
NOV'2019 COMPLETED - MAY'2020
43 DAI-DAN CO., LTD T2 GENSET REPLACE
INSTALLATION OF COOLING TOWER CONDENSER PIPE FOR GENERATOR SETS
DEC'2019 JUN'2022
44 SNK (ASIA PACIFIC) PTE LTD MEIJI SEIKA PRODUCTION LINE
PIPING WORKS
DEC'2019 MAY'2022
45 PRO-MATRIX PTE LTD DCSG AMK 7000 PTE LTD
PROPOSED ADDITIONS & ALTERATION WORKS TO 1ST STOREY OF EXISTING BUILDING AT 7000 ANG MO KIO AVENUE 5
JAN'2020 COMPLETED - SEP'2020
46 WAH LOON ENGINEERING PTE LTD EQUNIX SG3 LEVEL 7
ACMC SYSTEM INSTALLATION WORKS
JAN'2020 COMPLETED - NOV'2020
47 YORKOOL PTE LTD CLARKE QUAY MECHANICAL WORKS MAR'2020 COMPLETED - APR'2021
48 WAH LOON ENGINEERING PTE LTD EQUINIX SG 1 PHASE 14 MAR'2020 COMPLETED - OCT'2020
49 PRO-MATRIX PTE LTD 9TS-2
SUPPLY AND INSTALLATION OF AVMC PIPING WORK FOR PHASE 2A & 2B
MAR'2020 COMPLETED - APR'2021
50 THE MCST PLAN NO. 1008 PROPOSED REPLACEMENT OF 12 NOS AIR HANDLING UNITS & 3 NOS FAN COIL UNITS PARKWAY PARADE MAR'2020 COMPLETED - APR'2021
51 TRANE DISTRIBUTION PTE LTD KKH WOMEN'S AND CHILDREN'S HOSPITAL
MECHANICAL WORKS
MAR'2020 COMPLETED - JUN'2021
52 CARRIER SINGAPORE (PTE) LIMITED SPORT TURF CLUB
MECHANICAL INSTALLATION - THE CHILLER SYSTEMS REPLACEMENT
JUN'2020 COMPLETED - NOV'2021
53 YORKOOL PTE LTD SYNERGY
SUPPLY LABOUR AND ACCESSORIES, DELIVERY, INSTALL AND 12 MONTHS WARRANTY DURING DLP FOR 1 LOT OF PIPE INSTALLATION WORKS.
JUN'2020 COMPLETED - OCT'2021
54 WAH LOON ENGINEERING PTE LTD PDGSG1
TO SUPPLY NECESSARY LABOUR, MATERIALS AND TOOLS TO PERFORM 1 LOT OF ACMV INSTALLATION WORKS.
JULY'2018 COMPLETED - OCT'2021
55 GE AVIATION, ENGINE SERVICES - SINGAPORE PTE LTD JTC AEROSPACE @ SELETAR AEROSPACE PARK
PIPING INSTALLATION FOR THE COOLING TOWER AND FURNACES PROJECT ECLIPSE
SEP'2020 COMPLETED - APR'2021
56 KAER PTE LTD 7000 AMK-CAPEX
CHILLER 2 & COOLING TOWER REPLACEMENT
SEP'2020 COMPLETED - MAY'2021
57 KURIHARA KOGYO PTE LTD SGH H9A
TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER, HOT WATER AND CONDENSER WATER PIPEWORK FOR H9A AND BASEMENT 4 TO ROOF.
SEP'2020 SEP'2022
58 CARRIER SINGAPORE (PTE) LIMITED SINGAPORE TURF CLUB
MECHANICAL INSTALLATION - THE CHILLER SYSTEMS REPLACEMENT
OCT'2020 COMPLETED - APR'2021
59 KAER PTE LTD THE FULLERTON HOTEL
CHILLERS SYSTEM REPLACEMENT WORKS
NOV'2020 COMPLETED - JUN'2021
60 KURIHARA KOGYO CO., LTD IOI-119410 CENTRAL BOULEVARD DEVELOPMENT
TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER AND CONDENSATE WATER PIPEWORKS AT PODIUM AND EAST TOWER.
NOV'2020 COMPLETED - MAR'2022
61 PRO-MATRIX PTE LTD PJDC-1 DODID DATA CENTRE
SUPPLY, DELIVERY, INSTALLATION, TESTING & COMMISSIONING AND MAINTENANCE OF ACMV PIPING WORKS AND DUCTING WORKS
DEC'2020 COMPLETED - SEP'2021
62 DAI-DAN CO., LTD T316 T2 NEF PLANTRMS
T2 NFP PIPING WORKS
JAN'2021 COMPLETED - NOV'2021
63 TAKENAKA CORPORATION SINGAPORE LAND TOWER @ 50 RAFFLES PLACE SINGAPORE
THE DESIGN, SUPPLY AND INSTALL FOR ACMV WORKS
JAN'2021 JUN'2022
64 PRO-MATRIX PTE LTD 9TS-2C
SUPPLY, DELIVERY, INSTALLATION, TESTING & COMMISSIONING AND MAINTENANCE OF ACMV PIPING WORKS FOR PHASE 2C
FEB'2021 COMPLETED - AUG'2021
65 ENGIE SERVICES SINGAPORE DCS FOR SIT AT PUNGGOL ROAD
SUPPLY AND INSTALLATION OF MECHANICAL WORKS FOR DISTRICT COOLING SYSTEM (DCS) FOR SINGAPORE INSTITUTE OF TECHNOLOGY CAMPUS AT NEW PUNGGOL ROAD (PUNGGOL PLANNING AREA).
APR'2021 SEP'2022
66 JOHNSON CONTROLS (S) PTE LTD F&N SINGAPORE
MECHANICAL WORKS
MAY'2021 AUG'2022
67 I-LAB ENGINEERING PTE LTD ACTRIS PROJECT
SUPPLY AND INSTALL OF CHILLED/CONDENSER WATER PIPE WORK, CONDENSATE DRAIN PIPEWORK AND INSTALLATION OF AHU/ENERGY RECOVERY CHILLER/CHILLED WATER PUMP
MAY'2021 FEB'2022
68 LUM CHANG DEVELOPMENT FAMILY JUSTICE COURT
PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING CONSERVED BUILDING, THE OCTAGON AT HAVELOCK SQUARE FOR FAMILY JUSTICE COURTS SUPPLY AND INSTALLATION OF ACMV AND ESCS WORKS
MAY'2021 DEC'2022
69 SINGAPORE INSTITUTE OF MANAGEMENT GROUP LIMITED SIM BLOCK A
REPLACEMENT OF ROOFTOP COOLING TOWER (ONE CT-1) AT SIM BLOCK A
JUN'2021 COMPLETED - OCT'2021
70 KAER PTE LTD SUPREME COURT
MECHANICAL WORKS
JUN'2021 COMPLETED - DEC'2021
71 JOHNSON CONTROLS (S) PTE LTD MICRON MSB PLANT GLYCOL CHILLER REPLACEMENT SEP'2021 COMPLETED - AUG'2022
72 CARRIER SINGAPORE (PTE) LIMITED US EMBASSY
SUPPLY, INSTALL AND REPLACEMENT OF CHILLER PLANT SYSTEM. (MECHANICA
OCT'2021 COMPLETED - JUN'2022
73 CARRIER SINGAPORE (PTE) LIMITED ORCHARD SHOPPING CENTRE
SUPPLY, INSTALL AND REPLACEMENT OF CHILLER WATER SYSTEM
OCT'2021 COMPLETED - JUN'2022
74 ONE FOCUS ENGINEERING PTE LTD SINGAPORE MARRIOT TANG PLAZA HOTEL
A&A WORKS FOR HOT WATER SYSTEM CORRECTION AND MAJOR PIPES REPLACEMENT. CHILLED WATER PIPING SYSTEMS
NOV'2021 COMPLETED - AUG'2022
75 TRANE DISTRIBUTION PTE LTD MICRON F10 NORTH
MECHANICAL WORKS @ MICRON F10N (SG-9287- 10449)
DEC'2021 COMPLETED - DEC'2024
76 TRANE DISTRIBUTION PTE LTD MICRON F10 WEST
MECHANICAL WORKS @ MICRON F10W (SG-9287- 10533)
DEC'2021 COMPLETED - DEC'2024
77 DAI-DAN CO., LTD SDC DCPA STAGE 3
TO SUPPLY LABOUR, MATERIAL AND INSTALL CHILLED WATER, CONDENSER WATER AND OTHERWORKS
DEC'2021 COMPLETED - DEC'2022
78 TAKENAKA CORPORATION PROPOSED ADDITIONS / ALTERATIONS TO OFFICE AT 6TH STOREY OF SINGAPORE LAND TOWER ON LOT 00499M TS01 AT 50 RAFFLES PLACE (DOWNTOWN CORE PLANNING AREA)
SUPPLY AND INSTALLATION OF ACMV WORKS & TAKE DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF SMART DUCT DAMPER
JAN'2022 COMPLETED - APR'2022
79 THE MCST PLAN NO. 1008 REPLACEMENT OF 12 AIR HANDLING UNITS & 16 FAN COIL UNITS AT PARKWAY PARADE FEB'2022 COMPLETED - AUG'2023
80 SNK (ASIA PACIFIC) PTE LTD GOOGLE - WEN3 PROJECT LYW PAHSE 1A ZONE3
SUPPLY LABOUR, MATERIAL AND TOOLS TO INSTALL PIPE WORKS AND INSULATION WORKS
MAR'2022 COMPLETED - JUN'2023
81 SNK (ASIA PACIFIC) PTE LTD SIN 067 BBCS+PHASE1
ADDITIONAL RISER PIPE SUPPORT
MAR'2022 COMPLETED - MAY'2022
82 TRANE DISTRIBUTION PTE LTD ALCON CIBA VISION
MECHANICAL WORKS
MAR'2022 COMPLETED - JULY'2022
83 TRANE DISTRIBUTION PTE LTD ESPLANADE
MECHANICAL WORKS
APR'2022 COMPLETED - DEC'2022