Item | Client's Name | Description | Commencement Date | Completion Date |
---|---|---|---|---|
1 | CARRIER SINGAPORE (PTE) LIMITED | FAR EAST SHOPPING CENTRE MECHANICAL & ELECTRICAL WORK |
MAR'2017 | COMPLETED - DEC'2017 |
2 | DAI-DAN CO., LTD | DCS OUTDOOR COOLING TO SUPPLY & INSTALL CHILLED WATER PIP WORKS |
APR'2017 | COMPLETED - DEC'2017 |
3 | PRO-MATRIX PTE LTD | KINGSLANDS PHASE 4A TO SUPPLY LABOUR AND TOOLS TO INSTALL AIRCONDITIONING SYSTEMS FOR CHILLED, CONDENSER, CONDENSATE PIPEWORK SYSTEM AND LOOSE SITE, FOAMING INSUATION FOR CHILLED WATER PIPEWORK, FITTIG ACCESSORIES AND VALVE ACCESSORIES. |
APR'2017 | COMPLETED - FEB'2018 |
4 | TRANE DISTRIBUTION PTE LTD | WOODLANDS ICA MECHANICAL WORKS |
APR'2017 | COMPLETED - FEB'2018 |
5 | TRANE DISTRIBUTION PTE LTD | TUAS CHECKPOINT MECHANICAL WORKS |
APR'2017 | COMPLETED - FEB'2018 |
6 | PRO-MATRIX PTE LTD | KINGSLANDS PHASE 4A PROPOSED A&A WORKS TO 5TH STOREY AND 4TH STOREY OF EXISTING 5-STOREY SINGLE USER DATA CENTRE AT 13 SUNVIEW WAY, SINGAPORE 627541 SUPPLY CHILLED, CONDENSER AND CONDENSATE PIPEWORK, PIPEWORK FITTING, FITTING ACCESSORIES AND VALVE ACCESSORIES. |
APR'2017 | COMPLETED - FEB'2018 |
7 | DAI-DAN CO., LTD | DCS RAFFLES MRT TO SUPPLY & INSTALL 1 LOT OF ELECTRICAL AND CONTROL WORKS. |
MAY'2017 | COMPLETED - FEB'2018 |
8 | SNK (ASIA PACIFIC) PTE LTD | SINGTEL DATA CENTRE WEST AIR COOLED CHILLER SYSTEM FOR BACKUP, INSTALLATION OF NEW CHILLED WATER PIPING, SUPPLY & INSTALL SITE FOAMING INSULATION FOR CHILLED WATER PIPE. |
MAY'2017 | COMPLETED - FEB'2018 |
9 | TRANE DISTRIBUTION PTE LTD | NUS EA TO SUPPLY AND INSTALLATION OF ROOF COOLING TOWER BALANCE WORKS & L1 CHILLER PLANTROOM BALANCE WORKS AT EA ENGINEERING BUILDING WORKS AT EA ENINEERING BUILDING OF NUS. |
MAY'2017 | COMPLETED - JAN'2018 |
10 | GENNAL INDUSTRIES PTE LTD | SINGPORE EXPO PROPOSED ADDITIONS & ALTERATIONS WORKS TO SINGAPORE EXPO EXHIBITION HALL 1 TO HALL 6 ON LOT 09355P & 09356T MK27; EXHIBITION HALL 7 TO HALL 10 ON LOT 10851V PT, 98328L, 07361C, 10187K PT, 07360L PT MK27 AT EXPO DRIVE / UPPER CHANGI ROAD EAST / CHANGI SOUTH AVENUE 1, SINGAPORE |
AUG'2017 | COMPLETED - MAR'2018 |
11 | KAER PTE LTD | PLOT B1, PLOT B2 & PLOT D AT PAYA LEBAR FOR THE SUPPLY (OF SOME EQUIPMENT), INSTALLATION, COMMISSIONING AND MAINTENANCE OF CHILLER PLANT SYSTEM (CPS) FOR PAYA LEBAR QUARTER PLOT B1, B2 & D (OFFICE BLOCKS) PROJECT AT PAYA LEBAR ROAD |
AUG'2017 | COMPLETED - SEP'2018 |
12 | PRO-MATRIX PTE LTD | M7 PROPOSED RETRO-FITTING OF EXISTING 4-STOREY SINGLE-USER WAREHOUSE INTO DATA CENTRE AND ANCILLARY FACILITIES AT 71 TAGORE LANE SUPPLY LABOUR AND TOOLS TO INSTALL AIRCONDITIONING SYSTEM FOR CHILLED, CONDENSER SYSTEM AND LOOSE JOINT SITE FOAMING INSULATION FOR CHILLED WATER PIPEWORK. |
SEP'2017 | COMPLETED - MAR'2018 |
13 | VOLEX ENGINEERING PTE LTD | NUS UCC PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING UNIVERISTY CULTURAL CENTRE WITHININ NATIONAL UNIVERISTY OF SIGAPORE ON LOT 1703 & 2888 PT MK03, 10 KENT RIDGE CRESCENT. |
SEP'2017 | COMPLETED - JAN'2018 |
14 | PAN PACIFIC SINGAPORE | PAN PACIFIC SINGAPORE REPLACEMENT OF KITCHEN VENTILATION & EXHAUST FANS |
NOV'2017 | COMPLETED - 2018 |
15 | TRANE DISTRIBUTION PTE LTD | MECHANICAL WORK @ MAXWELL HOUSE | DEC'2017 | COMPLETED - JUL'2018 |
16 | KURIHARA KOGYO CO., LTD | APCS FACTORY - M&E TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER AND CONDENSATE WATER PIPEWORK FOR 1ST, 2ND AND 3RD STOREY. |
JAN'2018 | COMPLETED - AUG'2018 |
17 | TRANE DISTRIBUTION PTE LTD | NUS MD 3 CHILLED, CONDENSER AND CONDENSATE PIPEWORK SYSTEM |
FEB'2018 | COMPLETED - OCT'2018 |
18 | KURIHARA KOGYO CO., LTD | ACMV WORK AT CARGO AGENT BUILDING E. TO SUPPLY LABOUR, TOOLS AND MATERIALS FOR HOT TAPPING WORKS, CEILING WORKS, AIRCON DUCTWORKS, CHILLED WATER PIPEWORKS. |
FEB'2018 | COMPLETED - SEP'2018 |
19 | WAH LOON ENGINEERING PTE LTD | M&E INSTALLATIONS TO EQUINIX SG3 PHASE 3 AT NO.26A AYER RAJAH CRESCENT TO SUPPLY NECESSARY LABOUR, TOOLS & MATERIALS TO PERFORM 1-LOT OF 'ACMV INSTALLATION WORKS' AT L2 & ROOF. | MAR'2018 | COMPLETED - OCT'2018 |
20 | TAKENAKA CORPORATION | TANAKA ELECTRONICS SINGAPORE PTE LTD - COOLING TOWER | MAR'2018 | COMPLETED - SEP'2018 |
21 | SNK (ASIA PACIFIC) PTE LTD | HI-TECH -WEN 2 - TOWER 2 CORE & SHELL + ZONE 6 + ZONE 7 INSTALLATION OF PIPING WORK FOR TOWER 2 CORE & SHELL + ZONE 6 SUPPLY & INSTALL INSULATION WORK FOR TOWER 2 CORE & SHELL + ZONE 6 |
APR'2018 | COMPLETED - APR'2019 |
22 | DAI DAN CO., LTD | T3 NEW CHILLER PLANT SUPPLY LABOUR TO INSTALL CHILLED WATER PIPE, CONDENSER WATER PIPE AND CONDENSATE DRAIN PIPE |
MAY'2018 | COMPLETED - AUG'2019 |
23 | HOTEL MARINA CITY PTE LTD / (THE PAN PACIFIC HOTEL SINGAPORE) | REPLACEMENT AHU AND FCU AT PAN PACIFIC BOULEVARD | JULY'2018 | COMPLETED - OCT'2018 |
24 | DAI-DAN CO., LTD | SDC MOD DCP 1 TO CARRY OUT ALTERNATION AND ADDITIONAL BY PASS ON CHILLED WATER HEADER INCLUDE RELOCATION OF FCU AT DCP 1 |
JULY'2018 | COMPLETED - OCT'2018 |
25 | WAH LOON PLANT & INSTRUMENTATION PTE LTD | REPLACEMENT OF CHILLER PLANT 2 TO SG 1 AT NO.20 AYER RAJAH CRESCENT | AUG'2018 | COMPLETED - DEC'2018 |
26 | KURIHARA KOGYO CO., LTD | NTU CHILLER PLANT UPGRADING |
SEP'2018 | COMPLETED - DEC'2018 |
27 | ALMAX CONCEPTS PTE LTD | OFFICE TOWER TOILET REFURBISHMENT AT LEVEL 6 TO LEVEL 22 AT PARKWAY PARADE | OCT'2018 | COMPLETED - SEP'2019 |
28 | TRANE DISTRIBUTION PTE LTD | MICRON BENDEMEER CHILLER INSTALLATION WORK |
OCT'2018 | COMPLETED - JAN'2019 |
29 | DAI-DAN CO., LTD | SDC MBS 2018 - BAYFRONT EVENT SPACE (BES) TO SUPPLY, INSTALLATION AND COMMISSIONING OF SERVICE CONNECTION FACILITIES TO DEVELOPMENT AT MARINA BAY 2018 |
OCT'2018 | COMPLETED - DEC'2018 |
30 | TRANE DISTRIBUTION PTE LTD | MOUNT ELIZABETH HOSPITAL PROPOSED REPLACEMENT OF WATER COOLED CHILLER SYSTEM |
NOV'2018 | COMPLETED - MAY'2019 |
31 | DAI-DAN CO., LTD | MSD GLYCOL TO SUPPLY & INSTALLATION OF MECHANICAL PACKAGE INSULATION WORKS (OLD LOOP & OLD LOOP EQUIPMENT) |
DEC'2018 | COMPLETED - SEP'2021 |
32 | KAER PTE LTD | GREAT EASTERN CENTRE RETROFITTING WORKS & PERF GUARANTEE CHILLER PLANT |
DEC'2018 | COMPLETED - JULY'2019 |
33 | BRITISH AND MALAYAN | ALEXANDRA TECHNOPARK B COOLING TOWER REPLACEMENT WORK |
JAN'2019 | COMPLETED - JUN'2019 |
34 | DAI-DAN CO., LTD | SDC MBS 2018 TO SUPPLY, INSTALLATION & COMMISSIONING OF SERVICE CONNECTION FACILITIES TO DEVELOPMENT AT MARINA BAY 2018 AS FOLLOWS: |
JAN'2019 | COMPLETED - OCT'2020 |
35 | SIEMENS PTE LTD | SIEMEN CENTER EPC MEP & STRUCTURAL WORKS FOR INSTALLATION, TESTING AND COMMISSIONING OF A NEW WATER-COOLED CHILLER SYSTEM |
FEB'2019 | COMPLETED - AUG'2019 |
36 | WAH LOON ENGINEERING PTE LTD | CHINA MOBILE INTERNATIONAL SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 1 LOT OF AIR-CONDITIONING & MECHANICAL VENTILATION (ACMV) SYSTEM FOR LEVEL 3, 4, 6 & ROOF & SUPPLY, DELIVERY, INSTALLATION OF QUICK RELEASE FIRE DAMPERS AND DUCTS FOR CRAH UNITS, LEVEL 3, 4 & 6. |
FEB'2019 | COMPLETED - JULY'2019 |
37 | PRO-MATRIX PTE LTD | PROPOSED ADDITIONS AND ALTERATIONS OF AN EXSITING 6-STOREY INDUSTRIAL BUILDING WITH BASEMENT AT 9 TAI SENG DRIVE SINGAPORE 535227 | FEB'2019 | COMPLETED - NOV'2019 |
38 | SHINING DEVELOPMENT PTE LTD | PROPOSED ADDITIONAL & ALTERATION TO 1ST AND 2ND STOREY (PODIUM) OF EXISTING NOVENA SQUARE BUILDING ON LOT 00812A TS29 AT 238 THOMSON | MAY'2019 | COMPLETED - APR'2020 |
39 | SNK (ASIA PACIFIC) PTE LTD | GOOGLE - WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 & PHASE 1 ZONE 2 INSTALLATION OF PIPING WORK, PIPE INSULATION WORK FOR ZONE 0+1 | MAY'2019 | COMPLETED - MAY'2021 |
40 | CBRE PTE LTD | RAFFLES HOTEL FOR THE SUPPLY, FABRICATION, DELIVERY, INSTALLATION AND MAINTENANCE OF KITCHEN UPGRADING AND ASSOCIATED WORK FOR THE PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING THREE STOREY RAFFLES AND SHOPPING ARCADE WITH BASEMENT WITH A BASEMENT CARPARK AT BEACH ROAD, 328 NORTH BRIDGE ROAD |
AUG'2019 | COMPLETED - MAR'2020 |
41 | KURIHARA KOGYO CO., LTD | ICH SUPPLY AND INSTALL CHILLED WATER, CONDENSER AND CONDENSATE AND CONDENSATE PIPEWORKS FOR RIGHT WING AT INTEGRATED CARE HUB PROJECT |
SEP'2019 | SEP'2022 |
42 | TRANE DISTRIBUTION PTE LTD | PARAGON MECHANICAL WORKS |
NOV'2019 | COMPLETED - MAY'2020 |
43 | DAI-DAN CO., LTD | T2 GENSET REPLACE INSTALLATION OF COOLING TOWER CONDENSER PIPE FOR GENERATOR SETS |
DEC'2019 | JUN'2022 |
44 | SNK (ASIA PACIFIC) PTE LTD | MEIJI SEIKA PRODUCTION LINE PIPING WORKS |
DEC'2019 | MAY'2022 |
45 | PRO-MATRIX PTE LTD | DCSG AMK 7000 PTE LTD PROPOSED ADDITIONS & ALTERATION WORKS TO 1ST STOREY OF EXISTING BUILDING AT 7000 ANG MO KIO AVENUE 5 |
JAN'2020 | COMPLETED - SEP'2020 |
46 | WAH LOON ENGINEERING PTE LTD | EQUNIX SG3 LEVEL 7 ACMC SYSTEM INSTALLATION WORKS |
JAN'2020 | COMPLETED - NOV'2020 |
47 | YORKOOL PTE LTD | CLARKE QUAY MECHANICAL WORKS | MAR'2020 | COMPLETED - APR'2021 |
48 | WAH LOON ENGINEERING PTE LTD | EQUINIX SG 1 PHASE 14 | MAR'2020 | COMPLETED - OCT'2020 |
49 | PRO-MATRIX PTE LTD | 9TS-2 SUPPLY AND INSTALLATION OF AVMC PIPING WORK FOR PHASE 2A & 2B |
MAR'2020 | COMPLETED - APR'2021 |
50 | THE MCST PLAN NO. 1008 | PROPOSED REPLACEMENT OF 12 NOS AIR HANDLING UNITS & 3 NOS FAN COIL UNITS PARKWAY PARADE | MAR'2020 | COMPLETED - APR'2021 |
51 | TRANE DISTRIBUTION PTE LTD | KKH WOMEN'S AND CHILDREN'S HOSPITAL MECHANICAL WORKS |
MAR'2020 | COMPLETED - JUN'2021 |
52 | CARRIER SINGAPORE (PTE) LIMITED | SPORT TURF CLUB MECHANICAL INSTALLATION - THE CHILLER SYSTEMS REPLACEMENT |
JUN'2020 | COMPLETED - NOV'2021 |
53 | YORKOOL PTE LTD | SYNERGY SUPPLY LABOUR AND ACCESSORIES, DELIVERY, INSTALL AND 12 MONTHS WARRANTY DURING DLP FOR 1 LOT OF PIPE INSTALLATION WORKS. |
JUN'2020 | COMPLETED - OCT'2021 |
54 | WAH LOON ENGINEERING PTE LTD | PDGSG1 TO SUPPLY NECESSARY LABOUR, MATERIALS AND TOOLS TO PERFORM 1 LOT OF ACMV INSTALLATION WORKS. |
JULY'2018 | COMPLETED - OCT'2021 |
55 | GE AVIATION, ENGINE SERVICES - SINGAPORE PTE LTD | JTC AEROSPACE @ SELETAR AEROSPACE PARK PIPING INSTALLATION FOR THE COOLING TOWER AND FURNACES PROJECT ECLIPSE |
SEP'2020 | COMPLETED - APR'2021 |
56 | KAER PTE LTD | 7000 AMK-CAPEX CHILLER 2 & COOLING TOWER REPLACEMENT |
SEP'2020 | COMPLETED - MAY'2021 |
57 | KURIHARA KOGYO PTE LTD | SGH H9A TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER, HOT WATER AND CONDENSER WATER PIPEWORK FOR H9A AND BASEMENT 4 TO ROOF. |
SEP'2020 | SEP'2022 |
58 | CARRIER SINGAPORE (PTE) LIMITED | SINGAPORE TURF CLUB MECHANICAL INSTALLATION - THE CHILLER SYSTEMS REPLACEMENT |
OCT'2020 | COMPLETED - APR'2021 |
59 | KAER PTE LTD | THE FULLERTON HOTEL CHILLERS SYSTEM REPLACEMENT WORKS |
NOV'2020 | COMPLETED - JUN'2021 |
60 | KURIHARA KOGYO CO., LTD | IOI-119410 CENTRAL BOULEVARD DEVELOPMENT TO SUPPLY LABOUR, TOOLS AND MATERIALS TO INSTALL CHILLED WATER AND CONDENSATE WATER PIPEWORKS AT PODIUM AND EAST TOWER. |
NOV'2020 | COMPLETED - MAR'2022 |
61 | PRO-MATRIX PTE LTD | PJDC-1 DODID DATA CENTRE SUPPLY, DELIVERY, INSTALLATION, TESTING & COMMISSIONING AND MAINTENANCE OF ACMV PIPING WORKS AND DUCTING WORKS |
DEC'2020 | COMPLETED - SEP'2021 |
62 | DAI-DAN CO., LTD | T316 T2 NEF PLANTRMS T2 NFP PIPING WORKS |
JAN'2021 | COMPLETED - NOV'2021 |
63 | TAKENAKA CORPORATION | SINGAPORE LAND TOWER @ 50 RAFFLES PLACE SINGAPORE THE DESIGN, SUPPLY AND INSTALL FOR ACMV WORKS |
JAN'2021 | JUN'2022 |
64 | PRO-MATRIX PTE LTD | 9TS-2C SUPPLY, DELIVERY, INSTALLATION, TESTING & COMMISSIONING AND MAINTENANCE OF ACMV PIPING WORKS FOR PHASE 2C |
FEB'2021 | COMPLETED - AUG'2021 |
65 | ENGIE SERVICES SINGAPORE | DCS FOR SIT AT PUNGGOL ROAD SUPPLY AND INSTALLATION OF MECHANICAL WORKS FOR DISTRICT COOLING SYSTEM (DCS) FOR SINGAPORE INSTITUTE OF TECHNOLOGY CAMPUS AT NEW PUNGGOL ROAD (PUNGGOL PLANNING AREA). |
APR'2021 | SEP'2022 |
66 | JOHNSON CONTROLS (S) PTE LTD | F&N SINGAPORE MECHANICAL WORKS |
MAY'2021 | AUG'2022 |
67 | I-LAB ENGINEERING PTE LTD | ACTRIS PROJECT SUPPLY AND INSTALL OF CHILLED/CONDENSER WATER PIPE WORK, CONDENSATE DRAIN PIPEWORK AND INSTALLATION OF AHU/ENERGY RECOVERY CHILLER/CHILLED WATER PUMP |
MAY'2021 | FEB'2022 |
68 | LUM CHANG DEVELOPMENT | FAMILY JUSTICE COURT PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING CONSERVED BUILDING, THE OCTAGON AT HAVELOCK SQUARE FOR FAMILY JUSTICE COURTS SUPPLY AND INSTALLATION OF ACMV AND ESCS WORKS |
MAY'2021 | DEC'2022 |
69 | SINGAPORE INSTITUTE OF MANAGEMENT GROUP LIMITED | SIM BLOCK A REPLACEMENT OF ROOFTOP COOLING TOWER (ONE CT-1) AT SIM BLOCK A |
JUN'2021 | COMPLETED - OCT'2021 |
70 | KAER PTE LTD | SUPREME COURT MECHANICAL WORKS |
JUN'2021 | COMPLETED - DEC'2021 |
71 | JOHNSON CONTROLS (S) PTE LTD | MICRON MSB PLANT GLYCOL CHILLER REPLACEMENT | SEP'2021 | COMPLETED - AUG'2022 |
72 | CARRIER SINGAPORE (PTE) LIMITED | US EMBASSY SUPPLY, INSTALL AND REPLACEMENT OF CHILLER PLANT SYSTEM. (MECHANICA |
OCT'2021 | COMPLETED - JUN'2022 |
73 | CARRIER SINGAPORE (PTE) LIMITED | ORCHARD SHOPPING CENTRE SUPPLY, INSTALL AND REPLACEMENT OF CHILLER WATER SYSTEM |
OCT'2021 | COMPLETED - JUN'2022 |
74 | ONE FOCUS ENGINEERING PTE LTD | SINGAPORE MARRIOT TANG PLAZA HOTEL A&A WORKS FOR HOT WATER SYSTEM CORRECTION AND MAJOR PIPES REPLACEMENT. CHILLED WATER PIPING SYSTEMS |
NOV'2021 | COMPLETED - AUG'2022 |
75 | TRANE DISTRIBUTION PTE LTD | MICRON F10 NORTH MECHANICAL WORKS @ MICRON F10N (SG-9287- 10449) |
DEC'2021 | COMPLETED - DEC'2024 |
76 | TRANE DISTRIBUTION PTE LTD | MICRON F10 WEST MECHANICAL WORKS @ MICRON F10W (SG-9287- 10533) |
DEC'2021 | COMPLETED - DEC'2024 |
77 | DAI-DAN CO., LTD | SDC DCPA STAGE 3 TO SUPPLY LABOUR, MATERIAL AND INSTALL CHILLED WATER, CONDENSER WATER AND OTHERWORKS |
DEC'2021 | COMPLETED - DEC'2022 |
78 | TAKENAKA CORPORATION | PROPOSED ADDITIONS / ALTERATIONS TO OFFICE AT 6TH STOREY OF SINGAPORE LAND TOWER ON LOT 00499M TS01 AT 50 RAFFLES PLACE (DOWNTOWN CORE PLANNING AREA) SUPPLY AND INSTALLATION OF ACMV WORKS & TAKE DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF SMART DUCT DAMPER |
JAN'2022 | COMPLETED - APR'2022 |
79 | THE MCST PLAN NO. 1008 | REPLACEMENT OF 12 AIR HANDLING UNITS & 16 FAN COIL UNITS AT PARKWAY PARADE | FEB'2022 | COMPLETED - AUG'2023 |
80 | SNK (ASIA PACIFIC) PTE LTD | GOOGLE - WEN3 PROJECT LYW PAHSE 1A ZONE3 SUPPLY LABOUR, MATERIAL AND TOOLS TO INSTALL PIPE WORKS AND INSULATION WORKS |
MAR'2022 | COMPLETED - JUN'2023 |
81 | SNK (ASIA PACIFIC) PTE LTD | SIN 067 BBCS+PHASE1 ADDITIONAL RISER PIPE SUPPORT |
MAR'2022 | COMPLETED - MAY'2022 |
82 | TRANE DISTRIBUTION PTE LTD | ALCON CIBA VISION MECHANICAL WORKS |
MAR'2022 | COMPLETED - JULY'2022 |
83 | TRANE DISTRIBUTION PTE LTD | ESPLANADE MECHANICAL WORKS |
APR'2022 | COMPLETED - DEC'2022 |